295 Holloway Road

London
Completed Project - New Build

Located directly next to Holloway Underground Station, this new 257 bed student block will be constructed using modern building methods utilising prefabricated volumetric modular units manufactured off-site by Vision Modular Systems. Aluminium windows were installed by Century Facades Ltd at Visions factory. Century Facades has been appointed by Tide Construction to carry out the complete design, supply and installation façade package including curtain walling, doors, brick slip cladding, insulated render, and all associated feature metalwork items.

Century contract value £2.3m

Download Case Study